1987-2000 Electricity Peak Load Growth
Peak load in Ag sector declined by 300 MW.
Previous slide
Next slide
Back to first slide
View graphic version
Notes:
The CEC forecasted about 30 new central station power plants would be needed, while load actually grew by about 1/3 less.